Project Highlights

Bethlehem Landfill – New Hampshire

Bethlehem LandfillBethlehem Landfill

Bethlehem LandfillBethlehem Landfill

Scope of Work:

This 5.2 million dollar Stage IV Phase IIA Landfill expansion project is for North Country Environmental Services and scheduled to be completed over two seasons. The project includes construction of perimeter landfill berms, extension and connection to existing liner systems, temporary leachate management, waste excavation and relocation, construction of a leachate pump station, leachate collection piping, force mains, pumps and flow meters, waste regarding, modifications to existing gas collection systems, and installation of overlay liner system over existing waste slopes. A portion of the project including the new sump area and pump station will be completed by August of this season. Pike is the prime contractor on this project with several subcontractors.

Owner: North Country Environmental

Location: Bethlehem, NH

 

Hampton-North Hampton, 15678B

HamptonHampton

Scope of Work:

The purpose of this project was to introduce Open Road Tolling technology to the State of New Hampshire and New England. Being the first project of its kind in the five New England states, it required a high level of technical expertise and cooperation with the NHDOT to complete. The scope of work included the demolition of five existing toll booths and the construction of four high speed lanes through the middle of the toll plaza and the median area of the highway.

Benefits of ORT:

  • Reduce traffic congestion and travel delays both for motorists using ORT and those using a staffed toll lane.
  • Reduce the overall noise associated with a Toll Barrier by reducing the volume of traffic decelerating, stopping and accelerating to highway speeds.
  • Reduce vehicle emissions due to a reduction in the number of vehicles braking, stopping and accelerating at the barrier.

Owner: New Hampshire Department of Transportation

Location: Hampton, NH (tolls)